Precision Fabrication
For Tier 1 Contract Engineers

We work with engineers to deliver their desired outcome by focusing on world class fabrication and project clarity, right from the start.

We deliver on time, so you’re never late.

Precision Fabrication
For Tier 1 Contract Engineers

We work with engineers to deliver their desired outcome by focusing on world class fabrication and project clarity, right from the start.

We deliver on time, so you’re never late.

Contact:

08 6355 6530

tenders@allspec.au

19 Egmont Road, Henderson WA 6166

Download Capabilities Statement:

Contact:

08 6355 6530

tenders@allspec.au

19 Egmont Road, Henderson WA 6166

Download Capabilities Statement:

Our vertically integrated supply chain ensures complete control and transparency throughout the entire project, from detailing through to site delivery.

It’s your reputation on the line.

Do not put up with fabricators being late on supply, or your contractors getting to site to install equipment that has not been delivered, or it’s simply incorrect due to poor understanding of your design.

We know that poor quality drawings before production leads to on site dramas and project timeline blowouts. This is why we seek complete project clarity right from the start.

Allspec Engineering is trusted throughout Western Australia for successful installations that deliver our clients designed efficiencies.

We help you achieve this through:

  1. Detailing Collaboration for Complete Clarity
  2. Intelligent Drawings, Project Planning, & Procurement
  3. Technology and Process Driven Fabrication
  4. Integrated Logistics & Installation
  5. Full Spectrum Quality Control

Allspec Engineering has successfully completed the following list for Tier 1 Contractors accross Western Australia:

Fixed Plant Structural Steelwork

  • Stick Steel
  • Overland Conveyor Modules
  • Conveyor Trusses
  • Conveyor Trestles
  • Screen Surge Bin Structures
  • Crushing Surge Bin Structures
  • Tripper Assemblies
  • Screenhouse Shuttle Assemblies
  • Belt Feeder Frames
  • Apron Feeder Frames

    Fixed Plant Platework

    • Cast in Wear Packages
    • Head Chutes
    • Transfer Chutes
    • Impact Baffles
    • Trommel Chutes
    • Sample Station Chutes
    • Screen Oversize Hoods
    • Hoppers
    • Impact Boxes
    • HPGR Chute
    • Rubber Lined Boxes
    • Cyclone Clusters / Launders
    • Storage Tank Strakes
    • Fabricated Tanks – Storage and Mixing
    • Specialty Transport
    • Transport Frames

    Fixed Plant Process Piping

    • Process Water / Lube Spools
    • Rubber Lined Spools / 3D Bends
    • Ceramic Lined Spools / 3D Bends
    • Polyurethane Lined HDPE Spools

    Non-Process Infrastructure

    • MEM Workshops
    • Heavy Vehicle Wash Bays
    • Light Vehicle Wash Bays
    • Sumps and Cast in Steelwork
    • Diesel Storage Facilities
    • Diesel Piping
    • Safety Devices
    • Barricading Pods
    • Bollards
    • ANFO storage Facilities
    • Storage Sheds 

    Truss Assembly

    Garnet in paint for non slip surface

    30M Pipe Bridge

    Primary Underflow Chute

    Pipe Fabrication and Skid Assembly

    Truss Assembly

    Garnet in paint for non slip surface

    30M Pipe Bridge

    Primary Underflow Chute

    Pipe Fabrication and Skid Assembly

    Case Study

    66T South Flank Tie In Trusses

    Completed on schedule and on budget delivering a critical section of mine infrastructure for our client.

    Due to the size and width of the trusses, TQ’s were required to determine best slice locations for all the main chord sections and chequer plate flooring.

    Clearly written technical queries sent to our client at the very start of the process saved a lot of time and avoided costly delays.

    Choosing the correct welding processes, positions and welding pattern reduced distortion of the floor and square bar joints, reducing the need for post weld straightening. This made the process quicker and removed any unnecessary labour.

    Specialist lifting gear was required in order to protect the lifting lugs from side loading. This all had to be communicated, witnessed and managed down at our sub-contractor’s paint facility.

    Fabricated in accordance with AS/NZS 5131 and welded in accordance with AS/NZS 1554.1 SP.

    Fully assembled prior to dispatch.

    By understanding the end user’s needs we helped achieve an economical and time efficient outcome while delivering the strength and durability required by the engineers. We had a happy client and happy end user.

    3D modelling to 2D detailed shop drawings

    Loadout to surface treatment

    Trial fit handrails, NDT and final inspection

    Painted in four different paint systems as per client specifications

    3D modelling to 2D detailed shop drawings

    Loadout to surface treatment

    Trial fit handrails, NDT and final inspection

    Painted in four different paint systems as per client specifications

    Your Project Our Focus

    Results Driven Fabrication Services

    Your Project Our Focus

    Results Driven Fabrication Services

    Contact:

    08 6355 6530

    tenders@allspec.au

    62 Carpentaria Link, Hope Valley WA 6165

    Cut Plate & Wear Products

    In House Performance

    The Allspec Team

    Case Studies

    OH&S

    Download Capabilities Statement: